Skip to main content

Posts

Showing posts with the label interior design

The English garden of my dreams...

 may only exist on the wallpaper in this house.      But we're giving the bijou courtyard a damn good shot.  Thanks to my clever friend Fiona I have a lovely planting plan to work from.  After a good chat with Jose, the landscape guy, I changed a couple of things - Portuguese Laurel doesn't like our coastal air, so we're going to use a vine he likes for our hedging, for example. Jose was worried that the Amelanchier tree we were going to use might not grow in Zone 10,  so we're going for a Palo Verde which has the benefit of being native, albeit not half as pretty as an Amelanchier. But for the most part the plans are unchanged and the plant list is good to go. Concrete is poured and tile has been laid. It took some magic (various extra drains and little hidden supporting beams) courtesy of Ramos Masonry to make the tiles line up and be on the same grade as the kitchen floor. Totally worth the extra effort, because when these sliders are open it...

Quick slow quick quick slow

 Our sense of the passing of time is completely warped by these last few weeks. The paint we thought would take three or four weeks has now been going on for almost three months. We're on Week #11 and there's now a little light at the end of the tunnel, but my goodness it's been a long tunnel. So much prepping, priming, touching up, and in all the rooms on almost all the surfaces. Now I see the process, I suppose it was naive to think it would only take three weeks. I thought that's what the painter told me, but I wonder if I dreamt that, or misheard. Or he was kidding? Anyway, 13 weeks seems much more realistic than 3. Paint holds up a lot of things. They can't fit light fittings, or instal hardware like taps and towel bars, or put up wallpaper, or add cabinet doors till it's done. But now, room by room, as the paint gets finished up, those other things are getting done. And by contrast they seem to work at warp speed. In the last week our bedroom, the bathroom...

Big decisions

During June the cabinetry went from sketches, to random looking pieces of wood, to actual installed cabinets. Worktops went on and sinks were installed.  Stair rails went in too, after some to-ing and fro-ing about our insistence that the stair rods go straight into the tread. Glad we stuck to our guns. Now painting and staining is about to commence so we had to make a big decision. When we started this journey our Pinterest was full of baltic birch, very washed out and skandi looking. But I've leaned more and more into colour and texture and richness and depth - and I just don't think you have have bleached out cabinets with that look. Ash dreads a honeyed, school gym floor hue though.  Our painter created three samples. No, to Ash's point, there aren't only three stains in the world. He intended these as a starting point and would willingly do more if we needed. But why make life complicated? One of these, I think, is just right. Can you guess which one? Hope we made ...

Details, details

It's all about the details at the moment. Since the house is long since framed and drywalled we have a lot more time and energy to dedicate to minor details like the precise distance between the slats on our roof and garage door, or exactly how the stair rods should go into the stair treads. These are the details we had never thought about before. We may now be at risk of over thinking them. The point at which Ash started debating between a gap of 1-1/2" versus 1-7/16" gap between the slats I had to call time.  Honestly, now the roof is done, I'm not sure any of these would have been the wrong choice. Or if we'd even notice if the carpenter used a different measurement altogether. But it felt like an important decision at the time. The debate about how to insert the stair rods into the treads was easier. We want them to look as slick and seamless as possible. The slickest and most seamless option will cost an extra $10 per stair rod, as it involves hand machining ...

More roosting chickens

 More long ago tile choices being justified... And oooh, we're feeling pretty good about the way this roof deck is shaping up. The ADU kitchen doesn't quite look like the Pinterest vision but we're starting to see how it might, some day soon.

All our chickens are coming home to roost

We're starting to see the finished product. Tile is being laid, cabinets are being put in place, closets are under construction, and the siding is being painted. Some of these are short leadtimes: we briefed the carpenter on Wednesday morning and the closets were half built by the end of Thursday.  But some leadtimes have been longer, giving us plenty of time to second guess our choices.  After a couple of months of deliberation, we finalized the cabinet designs in September, signing off on sketches like the one below, and hoping my ability to visualize the real thing would not let me down. Now here they are, in pieces, but a little easier to picture the finished product. Fortunately we think we still like them, because we'd be a bit stuck if we didn't.  That might be post-rationalization, of course.  Tiles are the same story. We picked these out in September, paid for them in October... ...five months later here they are. Installed. Good job we like them. It is unne...

Taking shape (in six very lovely ways)

The skin is going on the house, outside and in. We're doing cement-board and stucco on the exterior, which will be black, white and grey because that's what you do when you build a house in 2021/22. Exterior elevations are in this old post . It's really nice to finally see those windows set in proper walls, and the waterproof wrap hidden with something that looks almost house-like. The Tyvek wrap look wasn't a keeper Where the siding meets the stucco Even more rewarding is the progress within. The drywall is up, and has been plastered and painted, so the rooms are starting to look a bit cleaner and neater. Some of my favourite features are already starting to shine. These six things in particular are giving me joy: 1. This archway, the entry to our closet, which matches the arch of our mirror. Makes me so happy. 2. This curve that hides a bunch of ugly necessities in the entrance to the guest room. Didn't want it, but now I love it. 3. Penelope's loft. I mean. 4...

Turning wallpaper dreams into reality

My last post was about how real it's all becoming - including some light online vanity shopping.  Then Black Friday struck and stuff got really really real. These are the big sales! There may be more around the corner, but who wants to wait for President's Day, or Memorial Day, with the supply chain being what it is at the moment?  Especially not now we have walls to paper - well, almost. Once the windows are in and the drywall is up we will.  Also honestly I've been ordering samples and looking at pictures and daydreaming and price comparing wallpaper for almost two years now and at this point I just want to stop thinking about it and know that the decision is made. This is the tip of the iceberg of wallpaper samples which I have now bequeathed to Penelope's craft supplies. It represents months of contemplation. In 'man days', it's a very expensive strategy engagement. Time to act. So I went ahead and hit the Black Friday sales. Hard and all at once. I orde...

Putting our money where our mouth is

 Stuff's getting really real.  What started out as pencil sketches 2 years ago -   - and then became proper floor plans not long after -  - prompted some sketching. Here's my rough idea of how our vanity would look: Here's the cabinet maker's rather more technical version: Now, wires and pipes have been put in place based on those renders. The plumber was done weeks ago, the electrician finished last week. Then I started looking at lights and mirrors and - oops - fell hard for some lights and mirrors that won't work with the way it was plumbed and wired.  I think this might be the perfect cabinet - not too hard-edged, but practical, slim but not stingy. And t hese lights will chime nicely with our Japanese tub and vaguely Asian spa tile. But to make them work we need the vanity to be more like this sketch which took me hours to produce: ...which required the lights to be rewired and the pipes moved. This picture shows all the conversations I've had with th...